Prolyte ST Tower

Request a quote

Prolyte
SKU: 112140010 Categories: , ,
 

Description

Prolyte ST Tower

 

Item code: 112140010

The ST tower is based on S40T mast sections. These mast sections have one-sided horizontal bracing to facilitate safe and easy climbing of the towers, with the use of an appropriate fall protection system. The ST tower uses several sleeve blocks that combine all the trusses from the S and B Series. This makes it possible to fit any of the S Series trusses to all four sides by means of bolted female CCS7 couplers. The ST tower has a self-weight of 120 kg. The ST sleeve block is a fully bolted structural element, making it much stronger and more precise than conventional welded versions. The ST tower is a cost-effective investment. You need only purchase the special parts if you wish to expand your truss system with towers.

There is a structural relation between tower length and size. Additionally, the applied load and the method of restraining the tower base also contribute to determination of the total loading capacity. All these factors must be taken into consideration when determining the allowable load and tower length.

 

Technical Specifications

  • Max Height – Depends on Structure Length
  • Max Loading Capacity – 2000kg
  • Sleeve Block suitable for Truss-Series – S36R•V, S52F•V, S66R•V, S100F and B100RV (with various sleeve blocks)
  • Alloy Alu Parts – EN – AW 6082 T6
  • Main Tubes Mast Sections – 50 x 4mm
  • Braces Mast Sections – 25 x 3mm
  • Coupling System – CCS6 series
  • Self Weight – 120kg

* To be used with chainhoist only.
** There is a structural relation between tower height and size, further the applied load and the method of restraining the tower base and top also have its influence on the total loading capacity. All these factors must be taken into consideration when determining the allowable load.

 

Additional information

Weight 120 kg